Presque Isle Electric & Gas Co-Op

Sidock Group, Inc. provided full A/E Design and Construction Administration Services for PIEG’s new 169,000 SF Headquarters Facility which was built on a former airport site with the total project area taking up almost 32 acres of the 107 acre site. Phase 1 builds Administration/Operations Offices with 17,210 SF on the First Floor and 14,871 SF on the Second Floor, as well as 95,302 SF of Warehouse/Storage. Warehouse/Storage includes Cold Storage, Heated Mechanics’ Garage, Heated Drive-Thru Garage, Heated Equipment Storage, Heated Vehicle Storage Garage, Heated Receiving/Storage, and Partially Heated/Unheated Metering. Phase 2 (future) is 42,000 SF of unheated storage with separate areas for vehicles and equipment. A 6,000 SF Data Center is planned for the future, bringing the total Gross Building Area (constructed and future) to over 175,000 SF. Structural building systems are a combination of tilt-up precast concrete, pre-engineered metal building, and conventional structural steel framing. Exterior veneers include daylighting panels, concrete and metal materials. Construction began in April, 2020 and despite COVID, was completed in 2021.

Features

  • Onaway, Michigan New Headquarters Facility
  • 32-acre project area on 107-acre site
  • 169,000 SF Headquarters Facility
  • Advanced Warehouse & Storage Solutions
  • Robust Structural Design
  • High-Performance Building Envelope
  • Operational Efficiency
  • Comprehensive A/E Design & Management
  • Construction Manager: Brivar Construction Company

From The

Client

PIE&G has been working with SGI for several years now to develop a design for its new Headquarters and Service Center. Several design iterations have taken place since our initial meetings and after finalizing our design and program requirements, we began construction in the spring of 2020.

Along the way, it quickly became apparent that SGI’s representatives were well equipped to assist in the identification of our organizational needs and to provide development expertise where needed. The staff was willing to work with us as we suggested or needed to view alternative designs to maintain budgetary integrity and organizational requirements. SGI staff was attentive to our needs and provided a design that we expect to meet PIE&G’s needs for several years to come.

As an organization that only takes on a project like this once every two or three generations, we only had once chance to get it right and I believe that with the skills and knowledge provided by SGI, we did just that.

Thomas J. Sobeck

President & CEO—Presque Isle Electric & Gas Co‐op