This project consisted of a major renovation at the Parnall Building, 4th Floor, north half, also known as “Parnall 2” Renovations included new ceilings, new flooring, new finishes, some new partitions, new spray applied fire proofing on steel, new window sills, new toilet rooms, new mechanical room, new ductwork, new air handlers, new hoods and fans, new VAV system, new piping, new boilers, new radiant heating, new fire suppression system, new fire alarms system, new access control, new in floor power, new electrical panels, new lighting, new UPS system, new DDC control system, and new transformer. Our scope of work included work on several floors in order to design a new HVAC system that would serve future floor renovations on multiple levels. Consumers required that the project be completed such that full operations continue uninterrupted.