Skip to content
This project consisted of Phase II of the General Motors Subsystems Volt Battery Production Plant. Sidock designed a 20,000 sq.ft. office facility inside of the plant, which included offices, conference areas, Team areas, quality control testing areas. Additionally, Sidock performed structural modifications, heavy power engineering with full generator backup, process piping, process air system,a nd general plant layout design. Sidock is also slated to perform the Phase III expansion, timing dependent on market conditions.